How Long Does It Take To Renovate A Kitchen?

Kitchens are the most crucial rooms for homeowners since they are where people spend the majority of their time. When it comes to kitchen renovations or other kitchen-related projects, every homeowner is intrigued about the time it takes to accomplish the task. 

Whether you want to know how long you’ll have to go without a fully functional kitchen or psychologically prepare for what’s to come, here’s a realistic timeline for a full kitchen remodel.

For every home creator, below is a little information about the timeframe of the kitchen renovation.

What are the different types of kitchen renovations?

There are two main types of kitchen renovations.

Replacement Kitchen Renovation

Replacement kitchen improvements are quite simple. Renovators simply replace your existing appliances and fixtures with brand new ones. No reconfiguration is required. For example, if you decide to replace your oven, the new oven will go exactly where the old one did.

Kitchen replacements normally take 6-8 weeks from beginning to end.

Custom kitchen renovation

Custom kitchen renovations take slightly longer than kitchen replacements since they frequently entail structural changes. If the homeowner wishes to shift things around, electrical work and other construction can slow the process.

Again, the exact duration can vary depending on your specific requirements, but bespoke kitchen renovations often take 10-12 weeks from start to completion.

Phase 1: Design

Duration period: 2 to 4 weeks

Every successful kitchen makeover begins with a well-planned design. In fact, the design phase is one of the most important elements in any refurbishment. There are numerous elements to consider, and it can be a daunting undertaking when taken on alone – but that’s where a professional designer can help.

Working with you, our designer will do a needs assessment to better understand your final goals for your kitchen makeover, particularly in terms of design. This will entail discussing your preferences and dislikes, wants and desires, and any ideas you may have.

From there, we will give you up to three options for your kitchen project, together with floor plans, elevations, and 3D renderings to assist you in making your decision.

During this step, design revisions will be proposed and implemented, and a final kitchen design plan will be chosen. This is the thrilling stage of the process where your vision becomes a reality!

For a more in-depth look at the kitchen renovation design process, please see one of our previous posts.

Phase 2: pre-construction

The duration – 4 weeks

The pre-construction phase is critical because it sets the tone for the actual building phase of your kitchen remodel. During this phase, which lasts about four weeks, we will generate working drawings, apply for building permissions (if necessary), and finalise the budget for your project.

As a homeowner, it’s also exciting to go shopping for kitchen components. Whether you visit a design centre or individual supplier showrooms, you will have the opportunity to touch, view, and experience a variety of countertops, flooring, tile, and other fittings. This is also the time to order your kitchen cabinets, which normally take four weeks to complete before building begins.

Phase 3: Construction

The duration: 6-10 weeks

The third and last phase is construction, during which demolition commences and sawdust flies. The timing of this phase will vary based on the extent, size, and complexity of your kitchen makeover. A modest, straightforward redesign can take about six weeks to complete, whereas a complex kitchen overhaul can take ten weeks or even more.

As a homeowner, this is the light at the end of the tunnel – the point in your project when you will see the most difference. You’ll get to see your area take shape as the HVAC, plumbing, and electrical are finished, and your insulation and plasterboard are installed. Flooring, cabinetry, and countertops will be installed next, followed by backsplash tile, plumbing fixtures, paint, and trim to complete your kitchen. Once your electrical fixtures and appliances are installed, you can wave the chequered flag and start enjoying your newly refurbished kitchen.

How Long Does It Take To Renovate A Kitchen?

Tips to Avoid Project Delays

Some situations are beyond our control, but that doesn’t mean we can’t take preventative measures to avoid delays. Follow these general guidelines to ensure that the renovation process runs as smoothly as possible.

  • Maintain ongoing communication with both your designer and general contractor.
  • Select products and materials early in the project to ensure that they can be ordered promptly.
  • Avoid making modifications after the design has been finalised.
  • Prepare your home for renovation.
  • Try not to micromanage the project.
  • Be available for your designer and contractor.

Communication is essential in almost every situation. Your contractor should be open with you about delays, and you should do everything you can to assist prevent them on your end.

In what order should you rebuild a kitchen?

The kitchen redesign may proceed in a different order based on the project manager’s opinion. However, in most cases, they adhere to these six phases.

  • Collecting ideas for the kitchen makeover. 
  • Creating a budget and timeline for kitchen renovations.
  • Existing kitchen demolition and cleanup.
  • Repairs of electrical wiring and plumbing systems.
  • Fixing the ceiling.
  • Fixing the kitchen walls.
  • Fixing the floor system. 
  • Arrangement of kitchen furnishings.
  • Installation of countertops.
  • Fixing kitchen appliances.
  • Final kitchen cleanup.
  • Then add a last touch to glam up the place.

These are the steps for a kitchen redesign. They are relatively simple and need less time if well-designed. You will have your new kitchen in no time.

Know More AboutBreaking Down the Truth: How Much Does A Kitchen Remodel Cost

Conclusion

From concept to completion, you should estimate three to four months for your kitchen remodel, depending on the extent of your project. It is a significant commitment in terms of time and interruption to your everyday life; yet, it is worthwhile because it not only boosts the value and utility of your home but also its enjoyment factor.

This timeline is a preliminary estimate. Unfortunately, many things can go wrong during a kitchen redesign, which will require more time. Any adjustments you make after the work has begun will result in at least one week of delay, possibly more. To ensure that your kitchen makeover goes successfully, make sure that all of your plans are finalised before beginning work.

 